• Cement Sheath Integrity During Thermal Cycling 

      Andrade, Jesús De (Doctoral thesis at NTNU;2015:291, Doctoral thesis, 2015)
      In the construction process of oil and gas wells, primary cementing constitutes a critical procedure of placing a cement sheath in the annulus between casing and formation, or between the casing strings. The main purpose ...